top of page
Project Details
800 meters of infrastructure at the pier and 200 meters of floating concrete pier Completion of the supply, installation, testing and commissioning of HDPE fire and utility water lines.
Client:
Ark Construction Industry and Trade Inc.
Business Area:
Pipelines
Completion Date:
2019
Location:
Izmir/Turkey
Scope:
Supply and Installation Works of HDPE Fire Water and Utility Water Lines in Infrastructure and Floating Pier
bottom of page