top of page
Project Details
The design, supply, fabrication and assembly works of the EPC system of the pump test setup system, where the German pump company Klaus Union can carry out factory tests before the pumps are delivered to their customers, has been successfully completed.
Client:
Klaus Union Turkey
Business Area:
Industrial Facilities
Completion Date:
2021
Location:
Izmir/Turkey
Scope:
Fabrication and assembly of pressure equipment resistant to 15m3 full vacuum, fabrication and assembly of related interconnection and utility pipelines
bottom of page