top of page

Marina Infrastructure and Floating Pier Piping Project

Project Details

800 meters of infrastructure at the pier and 200 meters of floating concrete pier  Completion of the supply, installation, testing and commissioning of HDPE fire and utility water lines.

Client:

Ark Construction Industry and Trade Inc.                 

Business Area:

Pipelines

 

Completion Date:

2019

 

Location:

Izmir/Turkey

 

Scope:

Supply and Installation Works of HDPE Fire Water and Utility Water Lines in Infrastructure and Floating Pier

© 2023 Kuark Industry Inc.

  • Linkedin
  • Instagram - Siyah Çember
bottom of page